Solar Savings for Fairfax School District and Interview with Superintendent Michael Coleman

September 10, 2018

Our team at ForeFront Power started working with Superintendent Michael Coleman at Fairfax School District in 2015 to create a renewable energy project to meet the needs across two locations, Zephyr Lane Elementary School and Shirley Lane Elementary School.  Given the availability of space at Zephyr Lane and the close proximity to the Shirley Lane campus across South Fairfax Road, our engineers were able to develop a single project solution to serve both locations.

Read More

Topics: california, case studies

STEM in Action: The Impact of the Schools Power Curriculum at Ohlone Elementary School

August 21, 2018

Like teachers and school administrators, our team at ForeFront Power has a passion for education and doing our best to make the future a better place for the next generation.

Read More

Topics: solutions, california, case studies

Dixon USD: How the District Successfully Completed 843 kW of Solar Across 5 Locations

June 15, 2018

ForeFront Power is proud to have worked closely with Dixon Unified School District to realize their renewable energy and savings goals. Our team partnered with Dixon USD to conceptualize, design, develop, and finance 843 kilowatts (kW) of solar power across five locations.

Read More

Topics: new projects, california, case studies

Paso Robles JUSD: Solar Explained With Superintendent Chris Williams

March 22, 2018

ForeFront Power’s partnership with Paso Robles Joint Unified School District is a great example of our ability to maximize a customer’s energy savings along with their solar footprint. Our team worked with Paso Robles JUSD to conceptualize, design, develop, and finance solar power at six district schools, totaling 1.7 megawatts (MW).

The portfolio maximized the District’s energy savings by utilizing carports that capitalize on available solar options like Net Energy Meter Aggregation (NEMA) and solar-friendly rate tariff, A-6. Moreover, the District was able to leverage a Power Purchase Agreement financing mechanism that offered the benefits of solar energy with no upfront cost.

Read More

Topics: new projects, california, case studies

Atascadero USD: The Story Behind The Decision to Adopt Solar

February 20, 2018

ForeFront Power prides itself on providing excellent service to school districts large and small across the United States. At Atascadero Unified School District in California, the ForeFront Power team developed two systems totaling 316 kilowatts (kW).

Read More

Topics: new projects, california, case studies